Boston Logan Terminal B & C
Boston, Massachusetts
Terminal B:
Description: In an effort to improve traffic at Boston Logan International Airport, we worked with MassPort, Bond Brothers, and SPS New England on the updates to Terminal B’s entrance roadways. Before these improvements, pickup and drop-off traffic would often back up onto roadways, creating a bottleneck. The Terminal B roadways project will resolve this issue by revamping the terminal area roadways to enhance the passenger experience.
The construction updates include demolition of existing roadway structures, relocation of utilities, installation of new utilities, and lighting & infrastructure for LED wayfinding signage. With a total project investment of approximately $190 million, these changes will create completely new roadways for both departures and arrivals at the airport.
Scope of Work:
Fenagh’s scope of work included onsite testing & inspections of concrete, soils, and steel. We also performed laboratory testing including concrete compression tests, particle size analysis (sieve), laboratory compaction characteristics (proctor), and pile grout sampling & compression tests.
Terminal C:
Description: Fenagh has provided inspections and materials testing of welding at Terminal C of the Boston Logan International Airport. We’ve worked with LGA Partners, Einstein Construction, Caruso Turley Scott, and InMotion Entertainment on this project.
Scope of Work: We’ve performed welding testing and inspections on the newly built iStore.