Central & Wolfe, Sunnyvale, CA
Fontana, CA
Project Durations: 2016-Ongoing
Construction Cost: $312M
Description: This project will redevelop an 18-acre site into an open space, LEED Platinum campus. The campus is composed of three four-story connected buildings and a two-story standalone amenities building. The total building square footage is 770,000 sf, of which 740,000 sf is office and 30,000 sf is services and amenities. There are four floors of occupied sitting above two levels of podium parking, with the lobbies and amenities located at the ground level. Because these are pot-tensioned, cast-in-place concrete buildings, all of the offices will have soaring 13 ½ foot floor-to-floor heights. The use of under-building podium parking and a standalone garage will preserve 53% of the 18-acre site area as open space while including over 90,000 sf of rooftop gardens.
Scope of Work: Fenagh performed pre-cast fabrication inspections in Fontana, CA.