SacRT Downtown Shelters
Hawthorne, California
Description: SacRT is moving forward with plans to improve its light rail service to Folsom along the “Gold Line” (Highway 50 corridor). The improvements would allow light rail trains to operate every 15 minutes, between the Sunrise Station and end of the line at the Historic Folsom Station, rather than the existing 30 minutes. The 15-minute service is currently impeded because only a single track serves between the Hazel Station and the Historic Folsom Station. As a result, eastbound light rail trains traveling from downtown Sacramento to Historic Folsom, and westbound trains traveling from historic Folsom to downtown Sacramento must use the same track. This plan includes the light rail station shelter improvement program.
Scope of Work: For this project, Fenagh provided structural steel and welding shop inspections including CWI ultrasonic testing (UT). Learn more about Fenagh’s services here.