Fenagh Seattle Core Services
Fenagh Seattle Leads the Construction Industry in Special Inspections, Material Testing, and Geotechnical Engineering.
-
Steel Visual (Welding/Details/High Strength Bolting/Cold formed) 2014 NYCBC Section 1704.3.1 to 1704.3.4
-
Nondestructive – UT, MT, PT 2014 NYCBC Section 1704.3.1
-
Steel Visual/UT Combination 2014 NYCBC Section 1704.3.1
-
Steel- Offsite 2014 NYCBC Section 1704.3.1
-
Concrete Sampling & Testing (TR-2) 2014 NYCBC Section Table 1704.4 Item 5&6
-
Concrete Cast-In-Place 2014 NYCBC Section 1704.4
-
Masonry 2014 NYCBC Section 1704.5
-
Soil Technician w/Nuclear Gauge and/or Sand Cone (portal-to-portal) 2014 NYCBC Section 1704.7.2 & 1704.7.3
-
Mechanical Systems (Ventilation Engineer/Installer) 2014 NYCBC Sections 1704.13 & 2702
-
Smoke Control Systems 2014 NYCBC Section 1704.14
-
Site storm Drainage Disposal and Detention System 2014 NYCBC Section 1704.20
-
Heating Systems/Boiler 2014 NYCBC Section 1704.23
-
Sprinkler Systems 2014 NYCBC Section 1704.23
-
Standpipe 2014 NYCBC Section 1704.24
-
Chimneys 2014 NYCBC Section 1704.26
-
Firestopping 2014 NYCBC Section 1704.27
-
Emergency Power systems (generator) 2014 NYCBC Section 1704.31
-
Energy Code Compliance (TR-8) 2014 NYCBC 109.3.S
-
Intumescent Coatings 2014 NYCBC Section 1704.12
-
Wall Panels, Curtain Walls, Veneers 2014 NYCBC Section 1704.1
-
Excavations- Sheeting, Shoring & Bracing 2014 NYCBC Section 1704.20.2
-
Seismic Isolation Systems 2014 NYCBC Section 1707.7
-
Fire Resistance Rated Construction 2014 NYCBC Section 109.3.4
-
Sprayed Fire-Resistant Materials 2014 NYCBC Section 1704.4.11
-
Post-Installed Anchors 2014 NYCBC Section 1704.32
-
Mechanical Demolitions 2014 NYCBC Section 1704.20.4
-
Underpinning 2014 NYCBC Section 1704.20.3
-
Structural Stability 2014 NYCBC Section 1704.20.1
-
Deep Foundation Elements (TR-5) 2014 NYCBC Section 1704.8
-
Helical Piles (TR-5H) 2014 NYCBC Section 1704.8.5
-
Subsurface Investigations (Boring 30 ft) includes TR-1 Initial & Final, TR-4, and Boring Logs (each) 2014 NYCBC Section 1704.7.4
-
Subsurface Investigations (Boring 50 ft) includes TR-1 Initial & Final, TR-4, and Boring Logs (each) 2014 NYCBC Section 1704.7.4
-
Subsurface Investigations (Boring 100 ft) includes TR-1 Initial & Final, TR-4, and Boring Logs (each) 2014 NYCBC Section 1704.7.4
-
Subsurface Investigations (test pits up to 7 ft deep) includes TR-1 Initial & Final, TR-4, and Test Pit Logs (each) 2014 NYCBC Section 1704.7.4
-
Specialty Inspector or where formal certification is required
-
Field Inspector with Special Enhancement
-
Laboratory Technician/Sample Runner
-
Technician Typist
About Fenagh
Fenagh Engineering & Testing team are New Yorkers working for New York. We understand the New York market—the pace, the expectation of excellence, and yes even the attitude. Fenagh New York provides a vast range of services including materials testing, special inspections, geotechnical engineering, and specialty testing to accommodate the varying structures in and around our city. Whether it be a high-rise, from the ground up, or a fit-out of a sprawling warehouse, Fenagh New York is your partner in engineering and inspection excellence.
The Fenagh Difference
Experienced & Certified Personnel
Fenagh Engineering and Testing (FET) was formed in 2014 as a response to meet clients’ universal need for a responsive engineering and inspection consultant.
Engineering Specialists
Our team of engineers, project managers, inspectors, and laboratory staff have countless years of experience in multiple markets and jurisdictions understanding what’s required and expected of our role.
Accredited Laboratories
As a third-party inspection and material testing laboratory, you can depend on FET to go above and beyond, ensuring projects are delivered on time and completed per code requirements.
Cost Effective
Our proactive, budget conscious management style will help you monitor your project for cost effectiveness and positive outcomes.
Our team is standing by
Phone
(253) 656-7776
bids@fenaghengineering.com
Address
22016 68th Ave
South, Kent, WA 98032